BIOGAS

Challenges

Raw material supply is essential for a biogas plant. An important criterion is the small supply radius. However, this does not eliminate many of the risks:

  • dependence on local substrate prices,
  • no long-term contracts with farmers,
  • local suppliers may fail or change the production profile,
  • drought or flood reduces the resource potential,
  • animal and crop diseases,
  • location of a biomethane biogas plant requires a connection to the gas network, where the main barrier is the investment costs,
  • as a solution, we offer resignation from the connection and liquefaction of biomethane (bio-LNG) or its compression (bio-CNG)

    Key aspects

    raw material logistics,

    developing optimal location requirements for biogas plants and biomethane biogas plants,

    selection of the type of raw materials (only some of them meet the criteria of high efficiency for biomethane biogas plants),

    adequate technical and organizational solutions,

    exemplary relations with the local government and community

    Portfolio

    MAJOR STUDIES AND PROJECTS IN THE FIELD OF BIOGAS AND BIOMETHANE TECHNOLOGY

    Enea Wytwarzanie

    1. Analysis of the directions of changes in operation for the Gorzesław biogas plant
    2. Development of the analysis and functional and operational program (PFU) and terms of reference (SIWZ/TOR) for the modernization of the Gorzesław biogas CHP plant

    Orlen Południe

    1. Development of a strategy for the expansion of a new business line (biomethane) together with Piela Business Engineering

    MAJOR STUDIES AND PROJECTS IN THE FIELD OF BIOGAS TECHNOLOGY FROM POULTRY MANURE

    DUCTOR

    1. Design and building permit for an agricultural biogas plant in Stary Chwalim with a capacity of 0.5 MW using 100% poultry manure
    2. Design and building permit for an agricultural biogas plant in Turowo with a capacity of 0.5 MW using 100% poultry manure

    Enea Wytwarzanie

    1. Development of technological solutions for the Gorzesław biogas plant using over 50% of chicken manure based on the German solution.

    Adler Agro

    1. Design and building permit for an agricultural biogas plant in Ryboły with a capacity of 1.4 MW. Construction of a biogas plant together with the company Biogas-Tech GmbH

    ZEW NIEDZICA S. A.

    1. Substrate analysis for a biogas plant located in Niedzica

    WestWind BIOGAZ

    1. Design and building permit for an agricultural biogas plant in Prószków with a capacity of 2.0 MW using more than 50% of poultry manure
    2. Design and building permit for an agricultural biogas plant in Czaple with a capacity of 1.1 MW using more than 50% of poultry manure

    PGNiG

    1. Preparation of an executive design for a biogas plant using more than 50% of poultry manure.